Customization: | Available |
---|---|
Warranty: | 1 Year |
Certification: | CE, ISO |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item Model |
LX-100 |
Outside dimension(mm) |
20000×5000×3200mm(L×W×H) |
Painting room dimension(mm) |
4900×4900mm(L×W) |
Drying room dimension(mm) |
14950×4900mm(L×W) |
Incoming door dimension(mm) |
1900*2200mm(W×H) |
Delivery door dimension(mm) |
1900*2200mm(W×H) |
Wall panels |
EPS with double-ply plate,tongue and groove construction,thickness:50/75mm |
Lighting |
Painting room:6 units×3=18 units×16W LED lamp Baking room:12 pieces×16W LED lamp |
Inlet fan |
2×4KW double-intake centrifugal fans,air capacity:24000m³/h |
Outlet fan |
1×7.5KW double-intake centrifugal fan,air capacity:18000m³/h |
Heating system |
30pieces × 1KW carbon fiber far-infrared heater,anti-explosion |
Filter system |
Intake air:Pre-filter,high efficiency filter(ceiling filter) Exhaust air:water curtain filtering |
Control system |
Lighting switch,spraying,baking temperature,time setting,emergency stop,temperature controller,power supply |
Total power |
45KW |
OUR SERVICES
1. LONGXIANG supports 24 hours online service , perfect after sales service system.
2.LONGXIANG provides short delivery time within 1 week.
3.Engineers available to serve machinery overseas.
4.LONGXIANG support 12-month warranty and will help to maintain it all life long.
Process
A) Non-welded CNC machining process is applied in more than 90% of spare parts to ensure the elegant appearance and excellence performance.
B) More than 10 years of intact use can be reached by strength of materials, perfect surface treatments and strict applicance of raw materials.
C) PU-perfusion technology is applied in main door for high strength and smooth surface.
D) Work process control by integrated circuit ensures more stable function.